Indonesia has great potential of geothermal accounted for around 28,617 MWe.
Based on Energy Management Blueprint, by 2025 it is expected around 9,500 MW geothermal powerplant (GeoPP) will be built.
There 58 geothermal working areas (GWAs) have been awarded for development.
58 GWAs |
The GWAs can be grouped into two categories, existing GWAs (awarded before 2003) and new GWAs (after 2003). Almost all existing GWAs are owned by PT PERTAMINA (15 GWAs).
GWAs Owned by PT PERTAMINA |
*PT PERTAMINA has been transferred 2 GWAs (Kotamobagu dan Bedugul) to government, Two companies, PT PLN and Yala Teknosa Geothermal are also owned three existing GWA.
In 2004, total installed geothermal power plant capacity was only 807 GW but then increased slowly to 1,189 in 2009 and 1,403.5 GW in 2014.
Installed Capacity 2004 |
Installed Capacity 2009 |
Installed Capacity 2014 |
In the medium development plan 2015-2019, it is expected that GeoPP will be up to 3,194.5 GW by 2019.
Planned Installed Capacity 2019 |